TTime-Trak/Blog
Download →
Story·3 min read·November 7, 2026

The Raise I Gave Myself Two Years Too Late

I had the data to justify a higher rate for years before I used it. The delay cost me more than I want to calculate.

I raised my rate eventually. The conversation went fine. The client accepted without much discussion. My new projects closed at the higher number without issue.

And then I thought about how long I had been sitting on evidence that I should have done this earlier.

Where the Evidence Was

I had been tracking time long enough to have real data. Historical project logs. Actual hours versus estimated hours. Effective hourly rates broken down by client and project type.

What those logs showed, once I looked at them seriously, was that my effective rate had been declining for about two years. Not because I lowered my prices. Because the work was taking longer than I scoped, and I wasn't adjusting anything.

I was getting faster at some things and slower at others. The projects I was winning were getting more complex. My rate hadn't moved, but the work had changed underneath it.

My time log was sitting there showing me an effective hourly rate that was meaningfully lower than what I thought I was charging. I just wasn't looking at it through that lens.

Why I Waited

Several reasons, most of them not very good.

I was nervous about losing clients. I told myself the market was uncertain. I had a vague sense that my rate was competitive even though I hadn't checked. I kept thinking I'd do it next quarter, after I landed the next project, once things settled down.

None of those reasons hold up when I look back. The clients I worried about losing didn't leave when I raised my rate. The ones who did leave weren't the clients I wanted to keep at the lower rate anyway.

What I actually needed was something concrete to justify the conversation to myself. I had it. I just hadn't built the habit of looking at my own data to make that kind of decision.

What Two Years Looks Like in Dollars

I did the rough math once, which I don't recommend if you want to feel good about your afternoon. Using the gap between what I charged and what my effective rate actually was, multiplied across two years of projects, the number was significant. Not catastrophic, but significant. The kind of number that makes you sit quietly for a minute.

The frustrating part is that the data to close that gap was always there. I wasn't missing information. I was just not building a habit of reviewing it and acting on it.

The Habit That Would Have Changed This

Once a quarter, look at your effective hourly rate across your recent projects. Not what you charged. What you actually earned per hour when you count all the time you put in.

If that number is trending down or sitting below where you want it, that's your signal. You don't need to overhaul everything. You might just need to adjust your rate on new projects, tighten your scopes, or have one conversation with a long-term client.

But you have to look at the number. It doesn't surface itself.

My time tracker had everything I needed. The project logs, the hours by category, the ability to see what I was actually earning. I was using it to track time and bill accurately, which was good. I wasn't using it to understand what my time was actually worth and whether my rate reflected that, which was the missed part.

The Raise Was Easy. The Waiting Was Not.

The clients took it fine. New clients never knew any different. The business didn't change in any dramatic way except that the work I was already doing now paid closer to what it was worth.

The only hard part was the two years before. And that part was optional. I could have skipped it if I'd been reading my own data.

Track your time, bill every minute.

Time-Trak is a native Mac and Windows time tracker with a floating timer, automatic screenshots, and one-click invoicing.

Free during beta.

Download Time-Trak →

macOS + Windows · Floating widget · Auto screenshots

More like this

← All articles·time-trak.com