The Project I Repriced Mid-Way and Lost Anyway

I caught the scope creep, raised the rate, and still walked away with less than I should have earned.

About six weeks into the project I could feel it. The work was bigger than the quote. The requests kept arriving. The scope had shifted in four or five small ways that each seemed reasonable in isolation.

So I did what you are supposed to do. I went back to the client and repriced.

They accepted without much argument. I felt like I had handled it well. I had not.

Why the Reprice Did Not Fix It

The new rate covered the extra scope I could see at that moment. What I did not account for was everything that had already happened before I sent that email.

I had been six weeks in. Six weeks of expanding work at the original rate. The reprice only applied going forward. All the hours I had already eaten were gone.

When I finally pulled the full log at project close, I had worked 94 hours on a project I quoted at 60. The reprice had saved maybe 10 hours worth of recovery. I was still down 24 hours compared to what I should have been paid for.

I had caught the problem. I had acted on it. And I still lost.

The Gap Was in My Logs

Here is where it gets worse. When I looked at my records for those first six weeks, they were not complete. I had rough notes and a few timer entries, but I had not been tracking consistently. So when I went to write the scope change email I could not actually show the client what had happened.

I could feel that the work had grown. I could not prove it in hours.

That matters more than you think. When you have a log showing 48 hours in six weeks on a 20-hour-per-phase project, the conversation is easy. You show the numbers. The client sees them. The reprice is obvious and justified.

When you have a vague sense that things have gotten bigger, the conversation is softer. You end up negotiating from instinct instead of data. And you tend to ask for less than you should because you cannot point to anything specific.

What I Do Now

I track from day one. Not when things start to feel wrong. From the first hour on the first day.

Time-Trak makes this easier because the timer is always visible. I do not have to remember to open a time-tracking app. It sits there. I click when I start. I add the project code. I stop when I stop.

By week two of any project I have a real picture of pace. I can see if I am burning faster than the quote assumed. I catch it early enough to have an honest conversation while there is still most of the project left to reprice fairly.

The screenshot feature also helps. When I go back to review a week of logs I can see what I was actually doing during each session. It removes the ambiguity. The hours are either there or they are not.

The Real Lesson

Repricing mid-project is better than not repricing at all. But it is a recovery move, not a strategy.

The actual strategy is knowing your hours in real time so you spot the drift before it becomes a problem. If I had been tracking properly from the start I would have seen the overrun in week two, not week six. The conversation would have been smaller, earlier, and easier to have.

I lost money on that project even after doing the right thing. That is what late data costs you. Not just the hours. The negotiating position that good data would have given you earlier.

Track your time, bill every minute.

Time-Trak is a native Mac and Windows time tracker with a floating timer, automatic screenshots, and one-click invoicing.

Free during beta.

Download Time-Trak →

macOS + Windows · Floating widget · Auto screenshots

More like this

← All articles·time-trak.com