The Project I Handed Off Without Closing My Timers

I passed a project to a contractor and forgot I still had open timers running. What followed was an invoicing nightmare.

Handing off work is supposed to feel like relief. You brief the contractor, share the files, wish them luck, and move on to the next thing.

I did all of that. I just forgot to close my timers.

This was a web development project. Mid-sized. I had been running point on it for about six weeks before I brought in a contractor to handle the remaining build work. My role was going to shift to review and client communication.

What I did not do was stop my active timers and mark my own tasks as done.

What Happened Over the Next Two Weeks

I kept logging time. Some of it was real. Client emails, a few review rounds, one call. But some of the entries I created were phantom entries, habit timers I started without thinking, old tasks I opened out of reflex.

I was not paying attention. I had mentally closed the project. My time log had not.

When I went to invoice at the end of the month, I pulled the project total and saw a number that did not make sense. I had logged more hours in the handoff period than I had in any two-week stretch during active development.

That was the signal something was wrong.

The Archaeology

I spent about an hour going back through every entry. Some were legitimate. Most of the last two weeks were not.

I found timers I had started and never stopped. One had run for six hours overnight. I had clearly forgotten to stop it before I closed my laptop. The entry said I was working on a task the contractor had taken over days earlier.

I found duplicate entries where I had started a timer, forgotten about it, started another one for the same task, and then logged both.

By the time I cleaned it up, I had to delete or correct about nine hours of logged time. Nine hours I could not bill. Nine hours I would have billed if I had not noticed the inflated total.

And if I had not noticed, I would have sent a client an invoice with nine fraudulent hours on it. Not intentionally. But the effect would have been the same.

The Habit That Prevents This

After that project, I built a close-out step into every handoff. Before I brief a contractor, before I share any files, I sit down with the project open in Time-Trak and I close everything. Every task. Every timer. I write a note in the final entry: handed off on this date.

That note becomes a hard stop. Anything logged after it needs a reason.

I also started using the screenshot log as a check. If I cannot see work product in the screenshots tied to an entry, and I cannot remember what the work was, that entry does not survive the invoice review. It gets deleted or corrected.

It sounds strict. It is. But invoicing phantom hours, even accidentally, is not something I want to do once, let alone twice.

What This Cost

In this case, nothing. I caught it before I sent the invoice.

But I have talked to other freelancers who sent invoices built on messy handoff data and had to issue corrections mid-project. One of them lost the client over it. The client assumed the error was intentional padding.

You cannot always explain your way out of a number that is too high. Sometimes the client just decides the relationship is too risky.

Closing your timers when you close a phase of work is a two-minute habit. Not having that habit cost me an hour of cleanup and a lot of unnecessary stress.

It could have cost me the client instead.

Track your time, bill every minute.

Time-Trak is a native Mac and Windows time tracker with a floating timer, automatic screenshots, and one-click invoicing.

Free during beta.

Download Time-Trak →

macOS + Windows · Floating widget · Auto screenshots

More like this

← All articles·time-trak.com