The Client Handshake That Started Before the Contract

I did two weeks of real work in the gap between a verbal agreement and a signed contract, and none of it made it to an invoice.

We had shaken hands on the project, metaphorically. The client said they were in. We had talked through the scope. I was excited. They were excited.

The contract took two weeks to actually land.

In those two weeks I did a lot of work. Not deliverable work exactly, but real work. I researched their industry. I audited what they had sent me. I drafted an approach doc. I had two calls to refine the direction.

None of it was running on a timer. There was no project set up yet. It did not feel official.

By the time the contract came through and I created the project in Time-Trak, those two weeks were gone. Unlogged. Unbillable. Just absorbed.

The Pre-Contract Zone Is Still Billable Time

This is a gap most freelancers fall into. The period between a verbal yes and a signed agreement feels like limbo. You do not want to send an invoice for work before the contract exists. So you do not log it. And then the project officially starts and that early work evaporates.

But those hours were real. Research is real. Planning is real. Prep calls are real. If the project had not moved forward, you would have written that time off as a failed pitch. Since it did move forward, it became invisible labor at the front of a paying engagement.

What I Changed

I started creating a holding project in Time-Trak the moment a client verbally committed. I call it pre-project or discovery depending on what the work is. I log every hour I spend from the moment it feels like real work, even if the contract has not arrived.

When the contract comes through and the project officially starts, I review those logged hours. Some of them were clearly scoping and prep work that belongs in my overhead. Some of them were substantive client-facing work that belongs on the invoice.

Having the log means I can make that decision intentionally. Without the log I am making the decision by default, which always means writing it off.

The Amount I Had Been Losing

When I went back through the year and estimated pre-contract hours I had not logged, the number was uncomfortable. Most projects had a week or more of pre-contract engagement. Some had two weeks.

At my rate, I had probably absorbed 15 to 20 hours of real work across the year that could have been partially billed as project discovery or formally included in a project kickoff line item.

That is a meaningful number. Not catastrophic. But real.

The Other Half of the Problem

The pre-contract period also sets the tone for scope. When I do not log what I explored before the project started, I have no record of what was discussed. When the client later says that was always part of the plan, I have nothing to point to.

A time log entry from a pre-contract call that says discussed approach to X and ruled out Y is a documentation asset. It is not just billing data. It is a record of how the project scope was formed before anyone signed anything.

Start the timer when the work starts. Not when the paperwork catches up.

Track your time, bill every minute.

Time-Trak is a native Mac and Windows time tracker with a floating timer, automatic screenshots, and one-click invoicing.

Free during beta.

Download Time-Trak →

macOS + Windows · Floating widget · Auto screenshots

More like this

← All articles·time-trak.com