How to Set Up a New Project Before Anyone Starts the Clock
The five minutes you spend setting up a project correctly before work starts will save you hours of cleanup at invoice time.
Most project setup problems show up at the end. Wrong rate applied. Hours logged under the wrong name. No task breakdown so everything is one giant blob called "work."
By then it is too late to fix cleanly. You are either guessing at what the hours mean or rewriting entries you cannot fully remember.
Five minutes at the start prevents all of it. Here is how to set up a project in Time-Trak before anyone starts logging a single minute.
Name the Project Clearly and Completely
The project name you create now will appear on reports and invoices. Make it one the client will recognize.
"Johnson" is not a project name. "Johnson Consulting - Brand Strategy Q3" is a project name. If you send a report and the client cannot immediately identify which project it covers, the name is wrong.
If you are working with a team or subcontractors, the name also needs to be unambiguous for everyone logging to it. Vague names produce mixed entries that you will spend time untangling.
Set the Billing Rate Before Any Time Is Logged
This step gets skipped constantly. Someone starts the timer, does real work, and the rate gets set later when it is remembered.
Set the rate first. If you have multiple rates, set them all. If a phase of the project bills at a different rate than another phase, create separate tasks or phases with their own rates attached.
In Time-Trak, you can assign billing rates at the project or task level. Do it before the first timer starts. The invoicing math will be automatic rather than something you reconstruct manually.
Create Task Categories That Match Your Deliverables
Do not leave the project as one blank container. Break it into the actual work.
If the project involves a discovery phase, content production, design reviews, and client calls, create a task or category for each of those. Logging ten hours to "project work" tells you nothing useful when you are trying to understand where time went.
Task categories also make your client reports readable. When a client sees a report grouped by deliverable rather than a single total, they understand what they paid for.
Set a Budget If the Project Has One
If the client has a fixed budget or the project has a quoted hour total, enter it in your time tracker now.
Time-Trak shows you project totals as you work. If you have a budget set, you can see at a glance how much of it you have used without running a manual calculation.
This prevents the scenario where you hit the budget ceiling and find out at invoice time. By then the work is done and the conversation is awkward. If you can see the budget depleting in real time, you have the conversation earlier when there is still room to adjust scope.
Record the Agreed Scope in the Notes Field
Before work starts, paste a summary of what was agreed in the project notes. This does not need to be the full contract. It just needs to be enough to remind you what was in and what was out.
Something like: "Includes homepage, about page, and services page. Up to two rounds of revisions per page. Excludes photography and additional pages."
When scope starts to creep, as it usually does, this note is what you check. It is also what you reference if a client questions the invoice.
Set Up Invoice Defaults
If you are going to invoice this client on a specific cycle, set it up now. Net 14, net 30, whatever was agreed.
Setting invoice terms before work starts means you are not hunting through emails to remember what you agreed when it is time to send the bill.
Five minutes of setup at the start is not overhead. It is how you protect the project from becoming a billing mess that nobody wants to untangle at the end.
Track your time, bill every minute.
Time-Trak is a native Mac and Windows time tracker with a floating timer, automatic screenshots, and one-click invoicing.
Free during beta.
Download Time-Trak →macOS + Windows · Floating widget · Auto screenshots